Beralih ke bagian utama
Beralih ke menu navigasi utama
Beralih ke bagian footer website
Open Menu
Journal Industrial Manufacturing
Current
Archives
Announcements
About
About the Journal
Submissions
Editorial Masthead
Privacy Statement
Contact
Cari
Register
Login
Beranda
/
Arsip
/
Vol 3 No 2 (2018): Journal Industrial Manufacturing
Vol 3 No 2 (2018): Journal Industrial Manufacturing
DOI:
https://doi.org/10.31000/jim.v3i2
Diterbitkan:
2018-07-15
Articles
PENERAPAN FUZZY TOPSIS UNTUK PEMILIHAN PEMASOK PADA DEPARTEMEN SUPPLY CHAIN DI PERUSAHAAN PENGOLAHAN AIR KABUPATEN TANGERANG
Diah Septiyana, Galang P. N. Hakim
1-8
PDF
ANALISIS PEMBAGIAN WAKTU KEDATANGAN SUPPLIER PADA INDUSTRI KOMPONEN OTOMOTIF
Ossa Sutaarga, Dian Friana Hidayat
9-14
PDF
ANALISIS KINERJA MESIN GF FSSZ 65/132 B DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT PRN
Hermanto Hermanto
15-22
PDF
ANALISIS PENJADWALAN ULANG PENERBANGAN PESAWAT BOEING 737-900ER PADA PT. BATIK AIR DI BANDARA SOEKARNO-HATTA
Henri Ponda, Joko Hardono, Dodi Gusnaldi
23-32
PDF
EVALUASI IMPLEMENTASI SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA DAN UPAYA PERBAIKAN DENGAN METODE HIRADC (STUDI KASUS DI PERUSAHAAN INJECTION MOLDING TANGERANG)
Hartono Hartono, Tina Hernawati
33-42
PDF
IMPLEMENTASI LEAN DENGAN MENGGUNAKAN METODE IMPROVEMENT KATA & COACHING KATA PADA PERUSAHAAN PENYEDIA LAYANAN LOGISTIK
Tri Widodo, Ismail Fardiansyah
43-48
PDF
APLIKASI ANALYTICAL HIERARCHY PROCESS (AHP) UNTUK PENENTUAN ALTERNATIF SISTEM MOLD MH14024 BOBBIN HORN DI PT MITSUBA INDONESIA
Sri Lestari, Desy Rosarina, Eko Hariyanto
49-58
PDF
PENERAPAN METHODOLOGY SIX SIGMA UNTUK MENGURANGI PEMBOROSAN BIAYA OPERASIONAL WASTE WATER TREATMENT DI PT CLARIANT INDONESIA (STUDI KASUS DI PERUSAHAAN KIMIA)
Nur Fadilah Fatma, Segi Anggi Pradipta
59-66
PDF
ANALISIS EFEKTIFITAS MESIN ROUGHING MILL DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE)
Heru Winarno, Faqih Ferdiansyah
67-78
PDF
ANALISIS EFEKTIFITAS KINERJA EXCAVATOR PADA AKTIFITAS OB REMOVAL PENAMBANGAN BATUBARAMENGGUNAKAN METODE OEE (STUDI KASUS: PT. RML EMBALUT – KALIMANTAN TIMUR)
Arif Nuryono
79-88
PDF
PERANCANGAN KERANGKA PENGUKURAN KINERJA BALANCED SCORECARD DENGAN METODE QUALITY FUNCTION DEPLOYMENT PADA PT. MML
Rudy Vernando Silalahi, Helena Juliana Kristina, Shelvia Shelvia
89-100
PDF
QUALITY IMPROVEMENT ON CERAMIC TILES PROUCTION PROCESS WITH SIX SIGMA METHOD (DMAIC) AT PT ARWANA CITRAMULIA
Priskila Christine Rahayu, Vanesa Darvin
101-110
PDF
ANALISIS PEMBAGIAN WAKTU KEDATANGAN SUPPLIER PADA INDUSTRI KOMPONEN OTOMOTIF
Ossa Sutaarga, Dian Friana Hidayat
9-14
Dikembangkan Oleh
Open Journal Systems
Bahasa
English
Indonesia