Analisis Tata Letak Stasiun Pada Usaha Mikro Kecil Menengah (UMKM) Tahu Menggunakan Software Flexsim
DOI:
https://doi.org/10.31000/jim.v11i1.14353Abstrak
One of the Tofu MSME in Cilegon faces various challenges in its production process, including long waiting times and suboptimal factory layout. This study aims to analyze the suitability between simulation results using FlexSim software and real system data to ensure the validity of the simulation model and provide recommendations for improving the production system. The simulation model was created based on actual operational data and analyzed through the Shapiro Wilk normality test and paired t-test. The results of the validity test showed a p-value of 0.7374 for the normality test and 0.9361 for the paired t-test, indicating that the simulation model is valid and in accordance with the real system. Recommendations for improvement include relaying workstation layouts, optimizing production process flow, and reducing bottlenecks at several workstations. The implementation of these recommendations is expected to improve operational efficiency, reduce waiting times, and increase productivity. Simulations with the proposed layout showed increased time efficiency and a more optimal station layout compared to the existing layout. This study provides an important contribution to optimizing the production process through a valid simulation approach, so that it can be used as a decision-making tool for future improvement scenarios.
Keywords: Simulation, Optimization, MSME, Flexsim
Referensi
Andira, A., Runtuk, J.K. and Maukar, A.L. (2020) 'Studi simulasi sistem pada perusahaan jasa pengiriman barang dan ekspedisi', Jurnal Rekayasa Sistem Industri, 9(3), pp. 145–152.
[2] Nurhasanah, N., Nurlina, S. and Nugroho, T. (2015) 'Simulasi FlexSIM untuk optimasi sistem antrian poli umum rawat jalan Rumah Sakit X', Jurnal Ilmiah Teknik Industri, 3(2).
[3]. Nashrulhaq, M.I., Nugraha, C. and Imran, A. (2014) 'Model simulasi sistem antrean elevator', REKA INTEGRA, 2(1).
[4] Indra, E., Aminatunnisa, S., Sembiring, D.M.S., Gultom, Y. and Matondang, E. (2019) 'Penerapan metode Monte Carlo untuk simulasi sistem antrian service sepeda motor berbasis web', Jurnal Sistem Informasi dan Ilmu Komputer Prima (JUSIKOM PRIMA), 2(2), pp. 77–84.
[5] Trenggonowati, D.L. (2016) 'Simulasi sistem proses produksi di PT. Jakarta Cakratunggal Steel Mills', Jurnal Ilmiah Teknik Industri, 4(1).
[6] Nurhasanah, N., Haidar, F.Z., Hidayat, S., Hasanati, N.U., Listianingsih, A.P. and Agustini, D.U. (2014) 'Penjadwalan produksi industri garmen dengan simulasi Flexsim', Jurnal Ilmiah Teknik Industri, 2(3), pp. 141–148.
[7] Strazdiene, E. and Laiskonyte, A., 2024, June. The Application of Process Simulation Software FlexSim in Textile Study Program. In ENVIRONMENT. TECHNOLOGIES. RESOURCES. Proceedings of the International Scientific and Practical Conference (Vol. 2, pp. 499-502).
[8] Purwanto, A., Asbari, M. and Santoso, T.I., 2021. Analisis data penelitian marketing: perbandingan hasil antara amos, smartpls, warppls, dan spss untuk jumlah sampel besar. Journal of Industrial Engineering & Management Research, 2(4), pp.216-227.
[9] Astanti, R., Mbolla, S. and Ai, T., 2020. Raw material supplier selection in a glove manufacturing: Application of AHP and fuzzy AHP. Decision Science Letters, 9(3), pp.291-312.
[10] Fabiani, Roberto, Giulia Naldini, and Manuela Chiavarini. "Dietary patterns and metabolic syndrome in adult subjects: a systematic review and meta-analysis." Nutrients 11, no. 9 (2019): 2056