USULAN PERBAIKAN TATA LETAK FASILITAS PRODUKSI YARN PROCESSING DENGAN METODE SYSTEMATIC LAY OUT PLANNING (STUDI KASUS DI PT. AP Tbk.)

Tina Hernawati Suryatman, Hartono Hartono, Rifqi Maulana Fadil

Abstract


PT. AP Tbk. A company engaged in the integrated textile industry, one of the companies that produce various types of high-quality production in yarn manufacturing. Problems that occur at PT. AP Tbk. Superior in yarn processing facilities. In the layout production facility has not been used optimally, location settings are not optimal. found a step back that caused the distance to be far away. For that, it is necessary to restructure the layout of these machines so that the total distance of material handling is faster. Based on the results of research and data processing using a systematic Layout Lay out method, the layout is more efficient when compared to the layout before repair. With the SLP method, two alternative layout locations are produced which can minimize the distance of the material flow and the cost of material handling. Layout 1 can save a distance of 45 meters by issuing material handling costs of 3881.52 rupiah from the initial layout, while layout 2 can save a distance of 57 meters by looking for material handling costs of 4744.08 rupiah from the initial layout. Thus, layout 2 is more recommended so that activities and production results are more optimal and handling of cost material becomes smaller.


Full Text:

PDF

References


Anwar, Bakhtiar, & Nanda R. (2015). Usulan Perbaikan Tata Letak Pabrik dengan Menggunakan Systematic Layout Planning (SLP) di CV. Arasco Bireuen. Malikussaleh Industrial Engineering Journal, 4(2), 4-10.

Azwir, H.H, & Pratomo, W.H. (2017). Implementasi Line Balancing untuk

Peningkatan Efisiensi di Line Welding. Jurnal Rekayasa Sistem Industri. 6(1), 57-64.

Bahale, A.P., & Deshmukh, S.S. (2014). Improving Material Handling Efficiency in a Ginning Machine Manufacturing Company, International Journal Of Innovative Research in Science Engineering and Technology. 3(3), 10180-10186.

Chandra, M. (2011). Perancangan Ulang Tata Letak Fasilitas Lantai Produksi Proses Perakitan Sofa, (Skrispi yang dipublikasikan), Fakultas Sains Dan Teknologi, Universitas Islam Negeri Sultan Syarif Kasim , Riau.

Cundara, N., Sugito, E., & Sanusi. (2017). Usulan Perbaikan Sistem Material Handling Dengan Menggunakan Systematic Layout Planning (SLP). Jurnal Ilmiah Teknik Industri, 2(1), 91-102.

Dwiharsanti, M., Gumilar, G., & Siswanto, H. (2016). Perancangan Ulang Tata Letak Fasilitas Laboratorium Pengujian Balai Besar Logam Dan Mesin. Jurnal Metal, 38(2), 56-67.

Faishol, M., Hastuti, S., & Ulya, M. (2013). Peracangan Ulang Tata Letak Fasilitas Produksi Pabrik Tahu Srikandi Junok Bangkalan. Jurnal Argointek, 7(2), 57-65.

Hossain, M.R., Rasel, M.K., & Talapatra, S. (2014). Increasing Productivity through Facility Layout Improvement using Systematic Layout Planning Pattern Theory, Global Journal Of Researches In Engineering. 14(7), 71-76.

Maheswari, H. & Firdauzy, A.D. (2015). Evaluasi Tata Letak Fasilitas Produksi Untuk Meningkatkan Efisiensi Kerja Pada PT. Nusa Multilaksana. Jurnal Ilmiah Manajemen dan Bisnis, 1(3), 56-83.

Maryana, & Meutia, S. (2015). Perbaikan Metode Kerja Pada Bagian Produksi Dengan Menggunakan Man And Machine Chart. Jurnal Teknovasi, 2(2), 15-26

Mieftah, E.M. (2009). Usulan Perbaikan Tata Letak Dan Fasilitas Area Produksi (Skrispi yang dipublikasikan). Fakultas Teknik, Universitas Sebelas Maret, Surakarta

Nugroho, R.O. (2012). Analisis Perancangan Ulang Tata Letak Fasilitas Produksi Pabrik Lama Pada CV. Massitoh Catering Services (Skrispi yang dipublikasikan). Fakultas Ekonomi dan Managemen, Institut Pertanian Bogor, Bogor

Pratiwi, I., Muslimah, E., & Aqil, A.W. (2012). Perancangan Tata Letak Fasilitas Di Industri Tahu Menggunakan Blockplan. Jurnal Ilmiah Teknik Industri, 11(2), 102-112

Rengganis, E. (2015). Perbandingan Optimasi Re-Layout Penempatan Fasilitas Produksi Dengan Menggunakan Craft Guna Meminimalkan Biaya Material Handling. Jurnal Angkasa, 7(1), 181-198

Shah, C.R., & Joshi, A.M. (2013). Increased Productivity In Factory Layout By

Using Systematic Layout Planning (SLP), International Journal of Advanced Engineering Technology. 4(4), 61-63.

Siska, M., & Hendriadi. (2012). Perancangan Ulang Tata Letak Fasilitas

Pabrik Tahu Dan Penerapan Metode 5S. Jurnal Teknik Industri. 13(2), 133-141.

Sutari, O., & Rao S. (2014). Development Of Plant Layout Using Systematic Layout Planning (SLP) To Maximize Production, International Journal Of Mechanical And Production Engineering. 2(8), 63-66.

Winarno, H. (2010). Analisis Tata Letak Fasilitas Ruang Fakultas Teknik Universitas Serang Raya Dengan Menggunakan Metode Activity Relationship Chart (ARC). Jurnal Teknik Industri, 2(3), 1–10.

Wiyaratn, W., & Watanapa. A. (2010). Improvement Plant Layout Using Systematic Layout Planning (SLP) for Increased Productivity, International Journal Of Industrial And Manufacturing Engineering. 4(12), 1382-1386.

Wulansari, A., & Yohanes, A. (2010). Perencanaan Ulang Tata Letak Fasilitas Produksi Untuk Penanganan Masalah Material Handling Dan Tata Ruang Di PT. Jamu Indonesia Simona. Jurnal Dinamika Teknik, 4(2), 13-23.

Yudawan, A.P. (2011). Penataan Ulang Tata Letak Pabrik Asesoris Mobil Berbahan Polimer Pada PT. FLN Dengan Metode Systematic Layout Planing (Skrispi yang dipublikasikan). Fakultas Teknik, Universitas Indonesia, Depok

Yohanes, A. (2011). Perencanaan Ulang Tata Letak Fasilitas Di Lantai Produksi Produk Teh Hijau Dengan Metode From To Chart Untuk Meminimumkan Material Handling Di PT. Rumpun Sari Mendini. Jurnal Dinamika Teknik, 5(1), 59-71.




DOI: http://dx.doi.org/10.31000/jt.v8i1.1624

Article Metrics

Abstract - 3231 PDF - 2797

Refbacks

  • There are currently no refbacks.