PRODUKTIVITAS TENAGA KERJA TERHADAP BIAYA DAN WAKTU PELAKSANAAN PADA PEMBANGUNAN RUKO 2 LANTAI

Siti Abadiyah, Ria Rosyati, Qori Nurjanah

Abstract


Productivity is the quantity of work a workforce achieves per day. The amount of productivity can be seen from the large quantity of work divided by the time it takes for labor to complete the job. One of the factors that influence the amount of work productivity is the number of workers. One of the factors affecting the amount of work productivity is the number of workers, however the number of workers per day needs to be limited based on the quantity of work and the cost of the project work. Therefore, it is necessary to know the estimated cost of work from the number of workers working on a job. Estimates of work costs are known from the number of workers and the wages of workers per day. From the research results, it is known that the cost of the productivity of the structure construction spent Rp. 223,492,785.00.

Keywords: Productivity, labor, time and cost.

Full Text:

PDF

References


Cornelia, Hary. 2003. Analisis Produktivitas Tenaga Kerja dalam Kaitannya Terhadap Waktu Dan Pelaksanaan Proyek Konstruksi. Denpasar: Universitas Udayana.

Darma, Putu. 2017. Analisis Waktu dan Biaya Berdasarkan Produktivitas Tenaga Kerja Pada Proyek Pembangunan Konstruksi. Denpasar: Skripsi Universitas Udayana.

Hamstudi. 2008. Analisa Harga Satuan Pekerjaan Pada Konstruksi Gedung Dengan Metode Bow SNI Dan Lapangan. Yogyakarta: Skripsi Universitas Islam Yogyakarta.

Maksiya, C. 2003. Analisa koefisien Tenaga Kerja Dan Bahan Untuk Pekerjaan Beton Cor. Denpasar : Universitas Udayana.

Santosa, Budi, 2009. Manajemen Proyek. Yogyakarta : Beta Offset.

Sedarmayanti, 2001. Sumber Daya Manusia dan Produktivitas Kerja. Bandung: Cv. Mandar Maju.




DOI: http://dx.doi.org/10.31000/civil.v3i2.7165

Article Metrics

Abstract - 366 PDF - 1176

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

CURRENT INDEXING STRUCTURE

 

       

 

------------------------------------------------------------------------------------------------------------------------------------------------