ANALYSIS OF THE LAYOUT OF THE COMPANY'S FACILITIES ON WORK PRODUCTIVITY WITH THE 5S PRINCIPLE AND THE ACTIVITY RELATIONSHIP CHART IN CV. TATA JAYA SCREEN PRINTING
Abstract
Full Text:
PDFReferences
Alghushan, A. A., Nuruddin, M., & Dahda, S. S. (2022). Proposed Improvement of Facility Layout in Production Area in Ud. Arshaindo Using the From To Chart (Ftc) Method. Journal of Applied Engineering and Technological Science, 4(1), 333–341. https://doi.org/10.37385/jaets.v4i1.1118
Ambika, S., Professor, A., & Vasanth Kumar, D. (2013). Performance Enhancement in a Print Pack Firm by Layout Optimization. 3(2), 237–244.
Astuti, M., Poerwanto, E., Trianingsih, A., Teknik, P., Sekolah, I., Teknologi, T., Yogyakarta, A., & Yogyakarta, L. A. (2017). ACTIVITY RELATIONSHIP CHART PADA INDUSTRI MEBEL BAMBU KARYA MANUNGGAL YOGYAKARTA. III.
Christian, R. S. (2018). Penerapan Evaluasi Ringkas, Rapi, Resik, Rawat, Rajin Pt. Inka (Persero) Madiun. The Indonesian Journal of Occupational Safety and Health, 7(1), 11. https://doi.org/10.20473/ijosh.v7i1.2018.11-19
Efendi, S., Pratikno, D., & Sugiono, E. (2019). Manajemen Operasional (Melati, Ed.). LPU-UNAS.
Hartari, E., & Herwanto, D. (2021). Perancangan Tata Letak Stasiun Kerja dengan Menggunakan Metode Systematic Layout Planning. Jurnal Media Teknik Dan Sistem Industri, 5(2), 118. https://doi.org/10.35194/jmtsi.v5i2.1480
Heizer, J., & Render, B. (2011). Operations Management: Manajemen Operasi buku 1. Salemba Empat. http://sitaka.polines.ac.id/pustaka/index.php?p=show_detail&id=22878%0Ahttp://sitaka.polines.ac.id/pustaka/lib/phpthumb/phpThumb.php?src=../../images/docs/AN,AK,PB
Jaya, J. D., Ayu, S., & Audinawati, N. U. R. (2017). Teknologi Agro-Industri Perancangan Ulang Tata Letak Fasilitas Produksi UD . Usaha Berkah Berdasarkan Activity Relationship Chart ( ARC ) Dengan Aplikasi Blocplan-90 Pendahuluan Tata letak fasilitas ( facilities layout ) adalah tata cara pengaturan fasili. Teknologi Agro Industri, 4(2), 111–123.
Muharni, Y., Febianti, E., & Vahlevi, I. R. (2022). Perancangan Tata Letak Fasilitas Gudang pada Hot Strip Mill Menggunakan Metode Activity Relationship Chart dan Blocplan Design of Warehouse Facility Layout at Hot Strip Mill Using Activity Relationship Chart and Blocplan Method. Jurnal Hasil Penelitian Dan Karya Ilmiah Dalam Bidang Teknik Industri, 8(1), 44–51.
Muslim, D., & Ilmaniati, A. (2018). Usulan Perbaikan Tata Letak Fasilitas Terhadap Optimalisasi Jarak dan Ongkos Material Handling Dengan Pendekatan Systematic layout planning (SLP) di PT Transplant Indonesia. Jurnal Media Teknik Dan Sistem Industri, 2(1), 45. https://doi.org/10.35194/jmtsi.v2i1.327
Nussanas, I. S. (2016). Implementasi-Konsep-Budaya-5R-Ringkas-Rapi, Resik, Rawat Dan Rajin) Sebagai Upaya Meningkatkan Kinerja Perusahaan Dari Sisi Non Keuangan. Jurnal Ekonomi Dan Bisnis, 4(1), 93–106.
Pattiapon, Marcy L, N. E. M. (2021a). Perancangan Ulang Tata Letak Fasilitas Produksi Dengan Ongkos Material Handling. 15(2).
Pattiapon, Marcy L, N. E. M. (2021b). Perancangan Ulang Tata Letak Fasilitas Produksi Dengan Ongkos Material Handling. 15(2).
Primasari, I., & Hidayanto, A. (2022). Perancangan Area Kerja Lantai Produksi Berdasarkan Metode 5s (Seiri, Seiton, Seiso, Seiketsu, Shitsuke). Prosiding Seminar Nasional Ilmu Sosial Dan Teknologi, 4(56), 352–356.
Rahman, I., Arianto, M. F., & ‘Aini, Y. (2021). Pengaruh Penerapan 5R (Housekeeping) terhadap Perilaku Keselamatan dan Kesehatan Kerja (K3) pada Perawat di Ruangan Perawatan. Windows Of Health, 4(4), 289–295.
Rizkina Arifin, R., & Andesta, D. (2023). Analisis Penerapan Seiri, Seiton, Seiso, Seiketsu dan Shitsuke di Departement Open Store PT XYZ. Jurnal Serambi Engineering, 8(4), 7101–7110. https://doi.org/10.32672/jse.v8i4.6768
Rosyidi, Moh. R. (2018). Analisa Tata Letak Fasilitas Produksi Dengan Metode Arc, Ard, Dan Aad Di Pt. Xyz. WAKTU: Jurnal Teknik UNIPA, 16(1), 82–95. https://doi.org/10.36456/waktu.v16i1.1493
Siregar, T., Kasih Asmarani, B., Alichia, C., & Magdalena. (2021). Implementasi Budaya 5R (Ringkas, Rapi, Resik, Rawat, Dan Rajin) Pada Kelompok Belajar Binaan Komplek Kodam Jatiwaringin. Prapanca : Jurnal Abdimas, 1(2), 44–50. https://doi.org/10.37826/prapanca.v1i2.123
Sofjan, A. (2008). Manajemen Produksi Dan Operasi. Lembaga Fakultas Ekonomi UI.
Sofyan, K., & Syarifuddin, D. (2019). Perancangan Ulang Tata Letak Fasilitas dengan Menggunakan Metode Konvensional Berbasis 5S (Seiri, Seiton, Seiso, Seiketsu dan Shitsuke). Jurnal Teknovasi, 02(2), 27–41.
Suprayitno, H., & Rahadi, D. R. (2021). Mencegah Kecelakaan Kerja Dengan Budaya 5R. Jurnal Pengabdian Kepada Masyarakat, 1(1), 20–29.
Widjajanto, T., Rahman, A., & Perdana, S. (2020). PENERAPAN 5S DI KANTOR POS JAKARTA PUSAT. Prosiding Seminar Nasional Pengabdian Masyarakat LPPM UMJ, September 2019.
DOI: http://dx.doi.org/10.31000/dmj.v9i2.13797
Article Metrics
Abstract - 311 PDF - 200Refbacks
- There are currently no refbacks.
Jurnal ini telah terindeks dalam:
Office:
Editor of Dynamic Management Journal (DMJ) UMT, Building F, 3rd Floor, Department Management Faculty of Economics and Business, Universitiy Of Muhammadiyah Tangerang
Jl. Perintis Kemerdekaan I No.33, RT.007/RW.003, Babakan, Cikokol, Kec. Tangerang, Kota Tangerang, Banten 15118
Wa: 08567312111 (Galuh), 085716034977 (Eky)
Email: dynamic@gmail.com
Dynamic management journal is licensed under Attribution-ShareAlike 4.0 International