PENENTUAN WAKTU BAKU DALAM PENGECEKAN BONDING SAMPEL SEPATU PADA PT. CHING LUH INDONESIA

Ossa Sutaarga, Alfiandy Setiawan

Abstract


PT. Ching Luh Indonesia is a company engaged in the manufacturing industry that produces sports shoes with well-known global brands, with annual revenues of more than US $ 1 billion, and has 8,000 workers. PT. Ching Luh Indonesia is a company that is responsive to technological advances and pays great attention to the comfort of employees in working, especially in the Laboratory section. In that section, the bonding checking process on the shoe samples currently still uses direct checking without any time reference in each sample. This is considered less effective because it makes the addition of the remaining sample for the next shift. This study aims to determine the standard time of each shoe sample variant and to determine the number of samples received by each operator. From the research results using the calculation of the standard time can be determined the standard time of each variant of the shoe sample, so it can also be determined the number of samples received for each operator. By determining the standard time for each shoe sample, it is expected that each operator can complete each sample according to the predetermined standard time, so that the specified target can be achieved..

 Keywords: Standard Time, Bonding, Shoe Samples, Laboratory, Operator

Full Text:

PDF

References


Afiani, R., & Pujotomo, D. (2017). Penentuan Waktu Baku dengan Metode Stopwatch Time Study Studi Kasus CV. MANS Group, Industrial Engineering Online Journal, 6(1).

Amri, A. (2014). Bahan Ajar Pengantar Teknik Industri. Aceh: Universitas Malikussaleh.

Ciptani, M. K. (2001). Peningkatan Produktivitas Dan Efisiensi Biaya Melalui Integrasi Time & Motion Study Dan Activity-Based Costing, Jurnal Akuntansi dan Keuangan, 3(1), 30-50.

Erliana, C. I. (2015). Bahan Ajar Analisa dan Pengukuran Kerja. Aceh: Jurusan Teknik Industri Fakultas Teknik Universitas Malikussaleh.

Kumar, S.A., (2006). Production and Operation Management. New Delhi: New Age International (P) Ltd.

Putranti, K. A., Herodian, S., & Syuaib, M. F. (2012). Studi Waktu (Time Study) Pada Aktivitas Pemanenan Kelapa Sawit di Perkebunan Sari Lembah Subur, Riau. Skripsi. Jurusan Teknologi Pertanian IPB, Bogor.

Sutalaksana, I. Z., Anggawisastra, R., & Tjakraatmadja, J. H. (2006). Teknik Perancangan Sistem Kerja. Bandung: ITB.

Zuriwiatma, M., Ushada, M., & Mulyati, G. T. (2014). Analysis of Capacity Constrained Worker Using Time Study, Heart Rate and Profile of Mood States (Case Study of Tempe Industry “Muchlar” Kasihan Bantul). Agritech, Vol. 34, No. 3, Agustus 2014




DOI: http://dx.doi.org/10.31000/jim.v6i1.4115

Article Metrics

Abstract - 2042 PDF - 2833

DOI (PDF): http://dx.doi.org/10.31000/jim.v6i1.4115.g2353

Refbacks

  • There are currently no refbacks.



Abstracted/Indexed On :


Google-Scholar-logo-2015    garuda1   Scilit logo   base logo   dimensions  


Counter Stat: