Perbaikan Perencanaan Penjadwalan Maintenance Pada Air Conditioner (AC) Menggunakan Metode Realibility Centered Maintenance (RCM) Di PT. Tifico Fiber Indonesia Tbk

Nur Fadilah Fatma, Henri Ponda, Trio Adi Saputra

Abstract


In this era of global competition, companies are required to increase productivity in their companies so that they can compete with other companies. One of the indicators in increasing productivity is the level of reliability of the production machines in the company. In measuring how good the reliability of a production machine is, an effective and efficient maintenance process is needed for the company. In this case the Air Conditioner or hereinafter abbreviated as AC is one of the indoor air conditioning devices. One company that uses an Air Conditioner or AC to support the production process and the activities of its employees, especially those working in the production room, is PT Tifico Fiber Indonesia Tbk. The purpose of this study is to determine the critical components and the appropriate interval of Air Conditioner maintenance. Then a study was conducted to propose maintenance scheduling time intervals using the Reliability Centered Maintenance (RCM) method and to determine critical components using the Failure Mode Effect and Analysis (FMEA). From the research, it was found that the critical components of the splite type Air Conditioner component were the outdoor fan motor with an RPN value of 120, a compressor with an RPN value of 200, an outdoor capacitor with an RPN value of 140 and an indoor pcb with an RPN value of 168. Mean Time To Repair (MTTR), Mean Time To Failure (MTTF) Reliability Centered Maintenance (RCM) method obtained by outdoor fan motors for 13 days, compressors for 10 days, outdoor capacitors for 90 days and indoor pcb for 24 days.

Keywords : Maintenance, Reliability Centered Maintenance (RCM), Mean Time To Repair (MTTR), Mean Time To Failure (MTTF), Failure Mode Effect and Analysis (FMEA).


Full Text:

PDF

References


Assauri, Sofjan, (2004), Manajenen Produksi dan Operasi, lembaga penerbit Fakultas Ekonomi Universitas Indonesia, Jakarta.

Baroto, Teguh, (2003),” Pengantar Teknik Industri”, Universitas Muhammadiyah Malang.

Ben-Daya, Mohammed, (2009), Handbook of Maintenance and Engineering, Springer, London.

Clifton, R. H, (1974), Principles Of Planned Maintenance, London : Arnold.

Egsean – Fungsi Masing-masing Komponen Pada AC Splite – Senin, 03 Agustus 2020 – 18 :21 WIB – http://egsean.com/fungsi-masing-masing-komponen-pada-ac-split

Firmansyah, Mohammad Amarrudin, dan Nurhalim, (2020), Analisis Reliability Centered Maintenance (RCM) Pada Mesin Hydraulic Press Plate Machine 1000 Ton (Studi Kasus PT.X), Jurnal Kajian Ilmiah dan Teknologi Teknik Mesin, Vol. 4 No.2 Hal. 19-23, ISSN 2541-3562.

Haq, Ikhbarul Muhammad, (2019). Penentuan Penjadwalan Preventive Maintenance Pada Komponen Mesin Callender di PT Ngagel Surabaya Wira Jatim, Jurnal Pendidikan Teknik Mesin, Vol. 9 No.1.

Hidayat R, Ansori N dan Imron A, (2010). Perencanaan Kegiatan Maintenance Dengan Metode Reliability Centered Maintenance II, Markara, Teknologi, Vol. 14 No.1.

Kurniawan, Fajar, (2013), Manajemen Perawatan Industri .Jakarta: Graha Ilmu.

Lian, G. Otaya (2016). Distribusi Probabilitas Weibull Dan Aplikasinya, Jurnal Manajemen Pendidikan Islam, Vol. 4 No. 2.

Lilinbiru Wordpress – Metode Reliability Centered Maintenance - RCM - Jumat, 01 Mei 2020 – 00 : 09 WIB - https://lilinbiru.wordpress.com/2011/09/28/metode-reliability-centered-maintenance-rcm/.

Pranoto, Hadi, (2015). Reliability Centered Maintenance. Jakarta : Mitra Wacana Media.

Putra, Boy Isma, (2010). Evaluasi Manajemen Perawatan Dengan Metode Reliability Centered Maintenance II, Teknolojia, Vol. 5, Hal. 59-66, Universitas Muhammadiyah Sidoarjo, Sidoarjo.

Prasetio, Putut Jatmiko Dwi, dan Susanti, Chandra Eko, (2015), Rancang Bangun Mesin Kripik Mangga Podang Kapasitas 10kg Per Proses ( Bagian : Perencanaan Perawatan), Jurnal Teknik Mesin, Vol. 4, No.1.

Sari, Dian Puspita, dan Ridho, Mukhammad Faizal (2016), Evaluasi Manajemen Perawatan Dengan Metode Reliability Centered Maintenance II Pada Mesin Blowing I di Plant PT Prisma Putra Textile, Jurnal Teknik Industri, Vol. XI , No.2, Hal. 73-80, Universitas Diponegoro.

Service AC Jogja – Mengenal Komponen AC Ruangan Dan Fungsinya – Senin, 03 Agustus 2020 – 18 : 40 WIB – http://serviceacjogja.pro/mengenal-komponen-ac-ruangan-dan-fungsinya/

Siregar, N. Munthe, S. (2019). Analisa Perawatan Mesin Digister dengan Metode Reliability Centered Maintenance pada PTPN II Pagar Merbau, Journal of Industrial and Manufacture Engineering, ISSN 2549-6336.

Taufik, Wirli Hidayanti. (2016). Keandalan Sistem Lintasan Produksi Pembuatan Pipa, Jurnal Optimasi Sistem Industri, Vol. 15 No.2.




DOI: http://dx.doi.org/10.31000/jim.v7i2.6935

Article Metrics

Abstract - 517 PDF - 942

DOI (PDF): http://dx.doi.org/10.31000/jim.v7i2.6935.g3595

Refbacks

  • There are currently no refbacks.



Abstracted/Indexed On :


Google-Scholar-logo-2015    garuda1   Scilit logo   base logo   dimensions  


Counter Stat: