Machines and equipment are one of the main strengths in supporting the continuity of the production process. To produce high-quality products, machines must be kept in optimal condition; therefore, appropriate systems and methods must be implemented. This thesis applies the Overall Equipment Effectiveness (OEE) method to determine the OEE value of the spinning machine and identify the dominant factors affecting productivity in the spinning machine. Overall Equipment Effectiveness is a comprehensive measurement tool involving three main components: availability, performance, and quality. Meanwhile, the Six Big Losses can be used to identify the causes of problems in the spinning machine. Based on the OEE calculation, the average result obtained is 64.62%. Additionally, the Six Big Losses calculation reveals the factors affecting the effectiveness of the spinning machine, including idle and minor stoppages at 31.89%, reduce speed losses at 30.32%, equipment failure losses at 5.60%, setup losses at 2.34%, defect losses at 1.78%, and reduce yield losses at 0.06%.
Keyword : Maintenance, spinning machine, Overall Equipment Effectiveness, Six Big Losse
Full Text:
PDFReferences
Abdul Wahid., Misbah Munir., Nuriyanto., Achmad Misbah., &nAyik Pusakaningwati. (2022) Mengukur Efektifitas Mesin Chenyueh Menggunakan Overall Equipment Effectiveness (Oee) Dan Six Big Losses Pada CV. ABI Surabaya. Journal of Industrial View Vol 04, Nomor 01 , 2022, Halaman 31 – 39.
Ade C. (2019). Analysis of Total Maintenance Productivity on Ships/Fleet To Increase Performance Using Overall Equipment Effectiveness (OEE) Method and Analysis of Six Big Losses. American International Journal of Business Management,Vol 2, 23-37.
Ating sudradjat., & Griffani Megiyanto Rahmatukkah. (2020). “Pedoma Praktis Manajemen Perawatan Mesin Industri”.
Assauri Sofian. (1999). “Manajemen Produksi dan Operasi Edisi Keempat”
Budi Aprina. (2019). “Analisa Overall Equipment Effectiffeness (OEE) Untuk Meningkatkan Daya Saing Dan Operational Excellence JITM Vol. 2, No.1.
Corder Antony.,& Hadi, K. (1992). “Teknik Manajemen Pemeliharaan”.
D. Wibisono., (2021), Analisis Overall Equipment Effectiveness (OEE) Dalam Meminimalisasi Six Big Losses Pada Mesin Bubut. Jurnal Optimasi Teknik Industri Vol. 03 No. 01, 7-13.
Dianra Alvira., Yanti Helianty., & Hendro Prassetiyo (2015). Usulan Peningkatan Overall Equipment Effectiveness Pada Mesin Tapping Manual Dengan Meminimumkan Six Big Losess. Jurusan Teknik Industri Itenas, Vol 3 No. 3, 240-251.
Delia Fitri Rahmadhani., Harsono Taroepratjeka., & Lisye Fitria. (2014) Usulan Peningkatan Efektivitas Mesin Cetak Manual Menggunakan Metode Overall Equipment Effectiveness (OEE). Jurnal Online Institut Teknologi Nasional, No.04, Vol.02.
Dewi N. (2019). Overall Equipment Effectiveness (OEE) Measurement Analysis on Gas Power Plant with Analysis of Six Big Losses. International Journal of Business Marketing and Management, Vol 4, 19-27.
Evi Febianti., Kiki Dwi Safitri., Kulsum, Bobby Kurniawan., Putro Ferro Ferdinant., & Hadi Setiawan (2022 ). Measurement Of Effectiveness Of Food Processing Machine Through Overall Equipment Effectiveness (OEE). Journal Industrial Servicess, Vol. 8, No. 1.
Enah Aminah., & Linda Theresia. (2018), ”Penerapan Teknik Kaizen Untk Total Productive Maintenance (TPM) Di Perusahaan Manucfatur “
Heri Awalul Ilhamsah., Samsul Amar., & Ahmad Akromul Kirom (2024) Efisiensi Mesin Vertical Roller Millsebagai Upaya Mereduksi Downtimedengan Pendekatan Oee (Overall Equipment Effectiveness) Dan Six Big Losses. Vol. 27No.1, Hal.101-117.
Hendri Pujianto, Dkk. (2021). “Penentuan Setelan Rotor Mesin Open End Untuk Pembuatan Benang Ne 6 sebagai Upaya Jaminan Atas spesifikasi dan Kualitas Pada Workshop Pemintalan di Ak-Tekstil Solo”. Vol 4(2), 46-53.
Jiwantoro., Agus. Bambang Dwi Argo.,& Wahyunanto Agung Nugroho. (2012). Analisis Efektivitas Mesin Penggiling Tebu Dengan Penerapan Total Productive Maintenance. Jurnal Keteknikan Pertanian Universitas Brawijaya. Vol.,1, No.2
Muhamad Dipa., Fitria Dewi Lestari., Muhamad Faisal., & Muhamad Fauzi. (2022). Analisis Overall Equipment Effectiveness (OEE) dan Six Big Losses Pada Mesin Washing Vial. Jurnal Bayesian: Jurnal Ilmiah Statistika Dan Ekonometrika. Vol.2 No. 1.
Musyafa’ah ., & Amanda Sofiana. (2022) Analisis Penerapan Total Productive Maintenance (TPM) Menggunakan Nilai Overall Equipment Effectiveness (OEE) dan Six Big Losses pada Mesin Disamatik PT. XYZ, Vol 15 No 1.
Nachnul Ansori.,& M. Imron Mustajab (2011). “Sistem Perawatan Terpadu (Intergrated Maintenance System)”.
Iqbal. (2017). Pengaruh Preventive Maintenance (Pemeliharaan Pencegahan). Jurnal Manajemen Dan Bisni.s Vol. 1 No. 3/ 1, 33-46.
Restyoko Adham Kameiswara., Arif Budi Sulistyo., & Wawan Gunawan. (2018) Analisa Overall Equipment Effectiveness (OEE) Dalam Mengurangi Six Big Losses Pada Cooling Pumpblower Plant PT. Pabrik Baja Terpadu. Jurnal InTent, Vol. 1, No. 1.
Rizky K, (2017). Usulan Penjadwalan Preventive Maintenance Pada Komponen Kritis Mesin Stone Crusher Menggunakan Model Age Replacement. Jurnal Teknik Industri, Vol 05, 273-285.
Sigit Nurcahyo.,& Wiji Safitri (2023) Analisa Overall Equipment Effectiveness Untuk Mengendalikan Six Big Losses Pada Mesin Produksi Part Packing. Vol 6. No 1.
Sunadi., Humiras Hardi Purba., & Else Paulina. (2021). Overall Equipment Effectiveness to Increase Productivity of Injection Molding Machine: A Case Study in Plastic Manufacturing Industry. Journal Computer, Mathematics and Engineering Applications.Vol. 12 No. 1, , 53-64.
Susanti Oktaria, (2012) ”Perhitungan Dan Analisa Nilai Dari OEE Pada Awal Pengolahan Kelapa Sawit”.
DOI: http://dx.doi.org/10.31000/jim.v9i2.12450
Article Metrics
Abstract - 137 PDF - 156DOI (PDF): http://dx.doi.org/10.31000/jim.v9i2.12450.g5543
Refbacks
- There are currently no refbacks.