Pengukuran Waktu Kerja Dengan Metode Time Motion Study Untuk Meningkatkan Produktivitas Kerja Produksi Greenware (Studi kasus : PT XYZ)

Ismail Fardiansyah, Tri Widodo, Weli Anggraini

Abstract


This study aims to determine the working time in order to increase productivity in greenware production in the formation section, the productivity of workers that will be calculated in this final project is the productivity of workers in the formation section in greenware production because the results of the production process every day are different and still exist,which has not reached its production target. The calculation of productivity is carried out using the time and study method, after obtaining the working time used to carry out the production process, then a new work method is applied to increase productivity results and a comparison is made before and after the implementation of the new work method, After applying the time motion study method to production Greenware in the formation section is known for the productivity results obtained, which are 121,350. After measuring working time using a time study and implementing the proposed improvement, the productivity results increased for the initial productivity results from 121.350 to 134.100, or an increase of 10.5%. 

Keywords: Working Time, Productivity,production targets, time and study, standard time.


Full Text:

PDF

References


Afiani, R., & Pujotomo, D. (2017). Penentuan Waktu Baku dengan Metode Stopwatch Time Study Studi Kasus CV. MANS Group. Industrial Engineering Online Journal, 6(1).

Analisis dan Pengukuran Kerja 2022 . Lampiran uji kecukupan data, https://123dok.com/document/y4e5vdkq-analisis-dan-pengukuran-kerja.html.

Cury, P. H. A., & Saraiva, J. (2018). Time and motion study applied to a production line of organic lenses in Manaus Industrial Hub. Gestão & Produção, 25, 901-915.

Damayanthi, H., & Hidayat, S. (2020, November). Pengukuran Waktu Baku Stasiun Kerja Pada Pipa Jenis Sio Menggunakan Metode Jam Henti di PT. XYZ. In Seminar dan Konferensi Nasional IDEC 2020 (pp. 1-9).

Dewi, N. F. (2019). Analisis Beban Kerja Dengan Metode Time and Emotion Study Di Unit Sekretariat Rumah Sakit X. Jurnal Administrasi Bisnis Terapan, 2(1).

Fithri, P., & Sari, R. Y. (2015). Analisis Pengukuran Produktivitas Perusahaan Alsintan CV. Cherry Sarana Agro. Jurnal Optimasi Sistem Industri, 14(1), 138-155.

Ghozali, M. W., & Hermansyah, M. (2016). Pengukuran Waktu Baku Proses Finishing Line Volpak Produksi Lannate Sp 25 Gram Philipina Guna Meningkatkan Produktivitas (PT. Dupont Agricultural Products Indonesia). JKIE (Journal Knowledge Industrial Engineering), 3(3).

Irawan, S. (2019).Pengukuran waktu kerja dalam menentukan waktu standar guna meningkatkan produktivitas kerja (Study kasus: Home Industry Irasari Leather) (Doctoral dissertation, Institut Sains dan Teknologi AKPRIND Yogyakarta).

John C. Messenger 2004, Working Time and Worker’s Preferences in Industrialized Countries, Switzerland.

John W. Hendry , F.R.Econs. S. F.I.F.M (1947), manual Time and Motion Study, A Pratical quide to the measurement of human endeavor in industry and to the development of productive efficiency, University of Wisconsin – Madison.

Krisnaningsih, E., Dwiyatno, S., & Sasongko, R. (2020). Usulan Penentuan Waktu Baku Pada Operator Packing Folding Kain Tetoron Rayon Dengan Metode Stopwatch. Jurnal Intent: Jurnal Industri dan Teknologi Terpadu, 3(2), 67-81.

Lei Delsen · Derek Bosworth · Hermann Groß Rafael Muñoz de Bustillo y Llorente (2007) Book of Operating Hours and Working Time, european union.

Marfin E Mundel (1960), Book of Motion and Time study : Principles and Practice Third Edition, Prentice-Hall, Englewood Cliffs, N.J

Merdeka.com (2022). Pengertian proses produksi lengkap dengan jenis, tahapn dan karakteristiknya,https://www.merdeka.com/trending/pengertian-proses-produksi-lengkap-dengan-jenis-tahapan-dan-karakteristiknya.html

Rio Prasetyo luko dono & siti kholisatul ulfa (2017) Penentuan waktu standar dalam proses pengemasan menggunakan time motion study stopwatch untuk mencari standar keluaran, Universitas Brawijaya Malang.

Sari, E. M., & Darmawan, M. M. (2020). Pengukuran waktu baku dan analisis beban kerja pada proses filling dan packing produk lulur mandi di PT. Gloria Origita Cosmetics. Jurnal Asiimetrik: Jurnal Ilmiah Rekayasa & Inovasi, 51-61.

SCRIBD.com (2013), ampiran Uji Keseragaman Data, https://www.scribd.com/doc/194277241/Lampiran-a-Uji-Keseragaman-Data

Setiadewi, E., Widowati, I., & Negara, L. J. Analisa Waktu Baku Proses Pemasangan Interior Unit Model Grand Livina di Section Chassis Line Departemen Trim Chassis PT. Nissan Motor Indonesia.

Setiadi, H., & Parulian, T. (2019). Penentuan waktu baku proses outbond di sentral pengolahan pos (SPP) Jakarta menggunakan metode time and motion study. Jurnal Logistik Bisnis, 9(02), 26-30.

Siplah Toko Ladang.com (2022), Stopwatch digital , https://siplah.tokoladang.co.id/produk/stopwatch-digital-genggam-timer stopwatch-100-profesional-3-baris-penghitung-waktu.882557

Slide Player,info (2018) pengertian Pengukuran Kerja , https://slideplayer.info/slide/12967218/

Usubamatov, R. (2018). Productivity Theory for Industrial Engineering, CRC Press.

Vekariya, A. P. (2015). Productivity improvement of manufacturing process of diesel engine by time and motion study method (MOST technique) (Doctoral dissertation).

Widagdo, G. U. (2013). Analisis perhitungan waktu baku dengan menggunakan metode jam henti pada produk pulley di CV. Putra mandiri jakarta. Jurnal PASTI Volume XII No, 1, 119-136.

Yunita, W (2018) Studi gerak, Waktu baku dan produktivitas. Bekasi. Jurnal Administrasi kantor, vol 4 no 1.




DOI: http://dx.doi.org/10.31000/jim.v7i2.6924

Article Metrics

Abstract - 1794 PDF - 4763

DOI (PDF): http://dx.doi.org/10.31000/jim.v7i2.6924.g3592

Refbacks

  • There are currently no refbacks.



Abstracted/Indexed On :


Google-Scholar-logo-2015    garuda1   Scilit logo   base logo   dimensions  


Counter Stat: