Analisa Waste Man hours Pada Pekerjaan Modifikiasi Structure Bulkhead Body STA 2598 Pesawat 747-400 Di PT. GMF Aeroasia Tbk

Ossa Sutaarga, Ivan Andrian Syarief

Abstract


This study aims to determine the cause of the actual man hours that did not reach the target in the interim modification work which refers to the modification of the STA 2598 bulkhead body structure on the 747-400 aircraft at PT. GMF Aeroasia Tbk. Tangerang. The type of research used in this study is a qualitative and quantitative method which refers to data taken from 15 aircraft that have performed aircraft maintenance at PT. GMF Aeroasia Tbk. By analyzing the man hours that have been partnered with the SAP application, value stream mapping analysis techniques are obtained to find out the source of the problem from the man hours delay with the stages of making current state mapping in current conditions, making process activity mapping to map existing activities at the time of work. takes place based on VA, NVA and NNVA and obtained from the results of the study the biggest cause of out of target in manhours in the modification of the structure of the bulkhead body STA 2598 on the 747-400 aircraft that was treated at PT. GMF AeroAsia Tbk is waste over processing which reaches 21 hours 38 minutes with a percentage of 14.74%, waste waiting as much as 1 hour 14 minutes with a percentage of 0.84% and a total waste motion of 30 minutes with a percentage of 0.34% with a total waste during work lasted for 23 hours 22 minutes with a percentage of 15, 97% with the proposed improvement by increasing the effectiveness of duration manhours which previously reached 145 hours 4 minutes, to 121 hours 12 minutes.

 

Keywords: VSM, Maintenance, Waste Analysis, Manhours, PAM


Full Text:

PDF

References


Amrina, E., & Lubis, A. A. A. (2017, April). Minimizing waste using lean manufacturing: A case in cement production. In 2017 4th International Conference on Industrial Engineering and Applications (ICIEA) (pp. 71-75). IEEE.

Ayu, F. T. B. (2018). Rekayasa Perbaikan Proses Produksi Boneka dengan Integrasi Metode Line Balancing dan Value Stream Mapping. Jurnal Operations Excellence: Journal of Applied Industrial Engineering, 10(3), 294-303.

Deshkar, A., Kamle, S., Giri, J., & Korde, V. (2018). Design and evaluation of a Lean Manufacturing framework using Value Stream Mapping (VSM) for a plastic bag manufacturing unit. Materials Today: Proceedings, 5(2), 7668-7677.

Goshime, Y., Kitaw, D., & Jilcha, K. (2018). Lean manufacturing as a vehicle for improving productivity and customer satisfaction: A literature review on metals and engineering industries. International Journal of Lean Six Sigma.

Lestari, K., & Susandi, D. (2019, August). Penerapan Lean Manufacturing untuk mengidentifikasi waste pada proses produksi kain knitting di lantai produksi PT. XYZ. In Prosiding Industrial Research Workshop and National Seminar (Vol. 10, No. 1, pp. 567-575).

Nallusamy, S. (2016). Efficiency enhancement in CNC industry using value stream mapping, work standardization and line balancing. International Journal of Performability Engineering, 12(5), 413-422.

Nallusamy, S. (2016). Lean manufacturing implementation in a gear shaft manufacturing company using value stream mapping. In International Journal of Engineering Research in Africa (Vol. 21, pp. 231-237). Trans Tech Publications Ltd.

Nallusamy, S., & Saravanan, V. (2016). Enhancement of overall output in a small scale industry through VSM, line balancing and work standardization. In International Journal of Engineering Research in Africa (Vol. 26, pp. 176-183). Trans Tech Publications Ltd.

Nurprihatin, F., Yulita, N. E., & Caesaron, D. (2017, July). Usulan pengurangan pemborosan pada proses penjahitan menggunakan metode lean six sigma. Seminar Nasional Akuntansi dan Bisnis (SNAB), Fakultas Ekonomi Universitas Widyatama.

Prasad, M. M., Dhiyaneswari, J. M., Jamaan, J. R., Mythreyan, S., & Sutharsan, S. M. (2020). A framework for lean manufacturing implementation in Indian textile industry. Materials today: proceedings, 33, 2986-2995.

Putri, L. S. C., Yanuar, A. A., & Suryadhini, P. P. (2018). Perancangan Line Balancing Untuk Meminimasi Waste Waiting Pada Proses Produksi Modul Surya 260wp Pt Xyz Dengan Pendekatan Lean Manufacturing. eProceedings of Engineering, 5(2).

Shah, D., & Patel, P. (2018). Productivity improvement by implementing lean manufacturing tools in manufacturing industry. International Research Journal of Engineering and Technology, 5(3), 3-7.

Singh, J., & Singh, H. (2019). Application of lean manufacturing in automotive manufacturing unit. International Journal of Lean Six Sigma, 11(1), 171-210.

Zahrotun, N., & Taufiq, I. (2018). Lean manufacturing: waste reduction using value stream mapping. In E3S Web of Conferences (Vol. 73, p. 07010). EDP Sciences.

Zulfikar, A. M., & Rachman, T. (2020). Penerapan Value Stream Mapping dan process Activity Mapping Untuk Identifikasi dan Minimasi 7 Waste Pada Proses Produksi Sepatu X Di Pt. Pai. Jurnal Inovisi, 16(1).




DOI: http://dx.doi.org/10.31000/jim.v8i1.8081

Article Metrics

Abstract - 288 PDF - 272

DOI (PDF): http://dx.doi.org/10.31000/jim.v8i1.8081.g4032

Refbacks

  • There are currently no refbacks.



Abstracted/Indexed On :


Google-Scholar-logo-2015    garuda1   Scilit logo   base logo   dimensions  


Counter Stat: