Penurunan Lead Time Manufacturing Dengan Pendekatan Lean Manufacturing Studi Kasus Di PT. MKM

Nur Fadilah Fatma, Henri Ponda, Solehah Solehah

Abstract


In the industrial world, it is very important to pay attention to the efficiency of production capacity where the manufacturing lead time for making shoe outsole is influenced by activities that are not value-added (Non Value Added) and activities that are not value-added but necessary (Necessary Non Value Added) in which there is some extravagance that occurs. These activities are in the form of temporary storage in the cooling room and the process of reworking defective products. The method used is Lean Manufacturing, the tools used are Value Stream Mapping (VSM) and Process Activity Mapping (PAM). VSM is used to identify activities that have cycle times exceeding takt time, followed by mapping the Activity Mapping process to analyze activities that are not Value Added. Based on the results of research from 4110 seconds, the process lead time of 3600 seconds is a non-value added activity. The rework process  and material storage in the cooling room were identified as having the largest value contributing to lead time, so rework must be eliminated. the percentage  of Process Cycle Efficiency (PCE) has increased. The reduction of the finished sheet material process is cooled to  the cooling room and the rework process  can save about 60 minutes of working time. Saving working hours can increase outsole production capacity  so that productivity increases and targets are achieved.

Keywords: Lead Time Manufacture, Lean Manufacturing, Value Stream Mapping, Prose Activity Mapping. Process Cycle Activity.


Full Text:

PDF

References


Andry Reza Anggara, P. P. (2018). Perancangan Perbaikan Area Kerja Sewing Untuk Mengurangi Waste Transportation Pada Pt Sansan Saudaratex Jaya Garment Menggunakan Pendekatan Lean Manufacturing . e-Proceeding of Engineering, 6849.

D.T. Matt, E. R. (2013). Implementation of Lean Production in small sized Enterprises.

Gaspersz, V. (2007). Lean Six Sigma for Manufacturing and Service Industries. Jakarta: PT Gramedia Pustaka Utama.

Hines, P. &. (1997). The seven value stream mapping tools. . International Journal of Operation & Production Management, Vol. 17.

Ramdani, R. (2020). Accelerates the Lead Time of the Toyota NR Engine V-Belt Replacement Process. Journal Engineering, 27-31.

Ryan, J. (2016). Declining Lead Time Process using Value Stream Mapping. International Journal of Operation & Production Management, 83-90.

Saputra, W. N. (2019). Identification of the causes of late delivery and efforts to reduce the process lead time at PT.X.

Siregar, d. (2018). Lean manufacturing analysis to reduce waste on the production process of fan products . IOP Conference Series: Materials Science and Engineering.

Sofian Bastuti, D. K. (2018). Analisis Pengendalian Kualitas Proses Hot Press Pada Produk Cacat Outsole Menggunakan Metode Statistical Processing Control (SPC) Dan Failure Mode Effect And Analysis (FMEA) Di PT. KMK Global Sports 2.

Suhendi, D. H. (2018). Perancangan Model Lean Manufacturing Untuk Mereduksi Biaya Dan Meningkatkan Customer Perceived Value . Jurnal Ilmiah Teknik Industri.

Sumiharni Batubara, R. A. (2016). Penerapan Lean Manufacturing Untuk Meningkatkan Kapasitas Produksi Dengan Cara Mengurangi Manufacturing Lead Time Studi Kasus: Pt Oriental Manufacturing Indonesia. Jurnal Penelitian dan Karya Ilmiah Lemlit USAKTI.

Sutalaksana, I. Z. (2006). Teknik Perancangan Kerja. Bandung: ITB.

Wahyu Adrianto, M. K. (2015). Analisis Penerapan Lean Production Process Untuk Mengurangi Lead Time Process Perawatan Engine (Studi Kasus Pt.Gmf Aeroasia) . Optimasi Sistem Industri.

Wahyundaru, S. D. (2019, Mei 6). Pentingnya Perencanaan dan Pengendalian Produksi Dalam Meningkatkan Kulaitas Produk. Retrieved from Kompasiana: http://www.kompasiana.com/azhaarrana/5ccfdebc3ba7f73c7463a162/pentingnya-perencanaan-dan-pengendalian-produksi-dalam-meningkatkan-kualitas-produk




DOI: http://dx.doi.org/10.31000/jim.v8i2.9584

Article Metrics

Abstract - 396 PDF - 283

DOI (PDF): http://dx.doi.org/10.31000/jim.v8i2.9584.g4436

Refbacks

  • There are currently no refbacks.



Abstracted/Indexed On :


Google-Scholar-logo-2015    garuda1   Scilit logo   base logo   dimensions  


Counter Stat: