Vol 3, No 1 (2021)

STRUCTURE (JURNAL SIPIL)

DOI: http://dx.doi.org/10.31000/civil.v3i1

Table of Contents

Articles

ANALISIS NILAI HASIL TERHADAP WAKTU PADA PROYEK RS HERMINA KUTABUMI TANGERANG
Sugeng Purwanto, Muhammad Ali Mu’min, Alan Fernanda
DOI : 10.31000/civil.v3i1.7154
Abstract views : 160 times | Download PDF - 187 times
PDF
80-88
STUDI PERBEDAAN TEMPERATUR BETON MASSA PADA PEKERJAAN RAFT FOUNDATION DENGAN KETEBALAN 2,5 METER
Siti Abadiyah, Basirun Basirun, Jamaludin Harits Nur Hafidz
DOI : 10.31000/civil.v3i1.7155
Abstract views : 162 times | Download PDF - 387 times
PDF
89-95
ANALISIS PERBANDINGAN BIAYA PELAKSANAAN PEKERJAAN BALOK METODE KONVENSIONAL DAN PRECAST PADA PROYEK ASPENA RESIDENCE BATUCEPER
Brian Alvandi, Ria Rosyati, Muhamad Abdu
DOI : 10.31000/civil.v3i1.7156
Abstract views : 258 times | Download PDF - 346 times
PDF
96-103
ANALISIS FAKTOR YANG MEMPENGARUHI WAKTU SEBAGAI DASAR DARI PERTIMBANGAN PENGAMBILAN KEPUTUSAN SISTEM PENUNJUKAN LANGSUNG PADA CONTRACT OF FIXED UNIT RATE
Saiful Haq, Muhammad Ali Mu’min, Ridwan Maulana Nurahman
DOI : 10.31000/civil.v3i1.7157
Abstract views : 193 times | Download PDF - 291 times
PDF
104-113
PERENCANAAN UPPER STRUCTURE PADA HIGH RISE BUILDING YANG BERLOKASI DI TEPI PANTAI DENGAN MENGGUNAKAN DUAL SYSTEM
Jeply Murdiaman Guci, Rully Angraeni Safitri, Sherena Donna Bella
DOI : 10.31000/civil.v3i1.7159
Abstract views : 381 times | Download PDF - 616 times
PDF
114-124