Mu’min, Muhammad Ali, Universitas Muhammadiyah Tangerang, Indonesia
-
Vol 2, No 2 (2020): STRUCTURE (JURNAL SIPIL) - Articles
ANALISA PERBANDINGAN WAKTU PENJADWALAN PROYEK DENGAN METODE CPM (CRITICAL PATH METHOD) DAN PERT (PROGRAM EVALUATION AND REVIEW TECHNIQUE)
Abstract PDF -
Vol 3, No 1 (2021): STRUCTURE (JURNAL SIPIL) - Articles
ANALISIS NILAI HASIL TERHADAP WAKTU PADA PROYEK RS HERMINA KUTABUMI TANGERANG
Abstract PDF -
Vol 3, No 1 (2021): STRUCTURE (JURNAL SIPIL) - Articles
ANALISIS FAKTOR YANG MEMPENGARUHI WAKTU SEBAGAI DASAR DARI PERTIMBANGAN PENGAMBILAN KEPUTUSAN SISTEM PENUNJUKAN LANGSUNG PADA CONTRACT OF FIXED UNIT RATE
Abstract PDF -
Vol 3, No 2 (2021): STRUCTURE (JURNAL SIPIL) - Articles
ANALISA KEBUTUHAN PENGGUNAAN ALAT BERAT PADA PEKERJAAN PEMBENTUKAN LAHAN PROYEK CLUSTER DUO PERUMAHAN TALAGA BESTARI UNTUK TERCAPAINYA EFISIENSI BIAYA PROYEK
Abstract PDF -
Vol 4, No 1 (2022): STRUCTURE (JURNAL SIPIL) - Articles
PENGARUH SEDIMENTASI TERHADAP KAPASITAS DEBIT RENCANA DAN KINERJA SALURAN PADA SALURAN INDUK CISADANE BARAT LAUT KABUPATEN TANGERANG
Abstract PDF
CURRENT INDEXING STRUCTURE
------------------------------------------------------------------------------------------------------------------------------------------------
Structure: Jurnal Teknik Sipil; Online ISSN (e-ISSN): 2580-3824
This work is
licensed under a Creative Commons Attribution 4.0
International License.